Cabletren Bolivariano, Caracas, Venezuela
Caracas, Venezuela
Project Start Date: January 2009
Planned Operations: December 2012
Key Features:
- urban pinched loop connector
- integrated in public transport system Caracas
- 2.1 km (1.30 miles)
- four fully synchronized trains each on an independent rope with a dedicated drive and return unit
- approx. 3,500 passengers per hour per direction (pphpd)
- walkthrough trains with no isolated cabins
| Length |
2,100 m (6,890 ft) |
|
Configuration |
pinched loop system with 4 drive units |
| Operating Speed |
47 km/h (29 mph) |
|
Headway |
230 seconds |
| Dwell Time |
34 - 57 seconds |
| Guideway |
elevated modular steel guideway |
| System Capacity |
3,500 pphpd |
| Stations |
5 |
| Trains |
four 4-car trains |
Train Capacity
|
58 passengers per vehicle / 232 passengers per train |