Search
DCC Home

MGM CityCenter Shuttle, Las Vegas, USA

   Print

Las Vegas, Nevada (USA)

Project Start Date: July 2006

Start of Operation: December 16, 2009








Key Features:

  • 8 billion dollar mega-project: CityCenter
  • 650 m (2,100 ft) system
  • 3,000 people per hour per direction
  • will connect the existing MGM hotels and casinos, Monte Carlo and Bellagio, with an intermediate station, called Sobella, in the heart of CityCenter
  • elevated CityCenter system preserves passenger views
  • custom-designed in black and gray
  • streamlined, futuristic profile
  • APM system enhances architecture planned for the CityCenter project
  • project includes 2,800 condominiums, three luxury hotels as well as high-end retail shops and restaurants

Length 650 m (2,100 ft)
Configuration dual track shuttle (with two trains operating independently)
Operating Speed 37.8 km/h (23.6 mph)
Headway 150 seconds
Dwell Time 24 seconds
Guideway elevated modular steel guideway
System Capacity 3,000 pphpd
Stations 3
Trains two 4-car trains
Train Capacity
33 passengers per vehicle
132 passengers per train



Links

Image Gallery

© 2010 DCC Doppelmayr Cable Car GmbH & Co KG
Downloads     Newsletter     Contact     Portal     Sitemap