Las Vegas Mandalay Bay Tram
Las Vegas, USA
Project Start Date: March 1998
Start of Operations: March 1999
The Cable Liner® Shuttle at Mandalay Bay connects 3 hotels: the Excalibur, Luxor and Mandalay Bay Resort hotel. The system enjoys 99.50 % availability. Operation of the Cable Liner® Shuttle began in April 1999. This was Doppelmayr Cable Car's first Automated People Mover system.
Length | 838 m (2,749 ft) | |
---|---|---|
Configuration | Cable Liner® Double Shuttle | |
Operating Speed | 36 km/h (22.4 mph) | |
Headway | 220 s | |
Dwell Time | 50 s | |
Guideway | Elevated steel truss | |
System Capacity | 1,300 pphpd; 1,900 pphpd (2nd system) | |
Stations | 4 | |
Trains | Two 5-car trains | |
Train Capacity | 160 passengers/train |

- Fastest, most convenient link between the major intersections of the three hotels
- More than 20 million people use the shuttle system per year
- Elevated guideway passes above street level
- One train serves four stations
- Second train is an express link to the end stations